MMGSY-II rural road DPRs, Ahilyanagar
51 roads, 244 km: road, culvert and bridge survey, traffic counts, CBR testing, pavement design, estimates and DPRs.
3 photos
51 roads, 244 km: road, culvert and bridge survey, traffic counts, CBR testing, pavement design, estimates and DPRs.
4 photos
41 roads, 200 km designed with thin white-topping over the existing road.
4 photos
35 roads, 199 km designed with full-depth reclamation and cement-treated base layers.
3 photos
140 km of rural roads surveyed, investigated and designed, with culverts and estimates.
3 photos
Road DPRs for ten talukas, plus investigation, hydrological survey and DPRs for three bridges.
2 photos
14 two-lane submersible and minor bridges, 410 m in all: survey, 18 boreholes (165 m) with lab tests for bearing capacity and scour, design and DPRs.
Similar work
DGPS survey, traffic survey, soil investigation, design and DPR for a state highway link.
3 photos
About 120 km of road condition surveys, before and after construction.
3 photos
Topographic survey, trial bores and geological survey, and pipe distribution network design in WaterGEMS for rural tap water schemes.
2 photos
16 km double levelling, 14 km detailed survey, 100 m of trial bores with core logging, 700 cum trial pits and a geological report for the Godavari intake and talav grid.
Similar work
696 ha of command surveyed with georeferencing, chak planning, pipe distribution network design and estimate.
Similar work
DGPS survey superimposed on village maps, contours, chak planning and full PDN design.
2 photos
Survey along the rising main and capacity calculations for village ponds and a KT weir.
3 photos
Topographic and structural survey of distributaries and water courses for canal section and structure repairs.
3 photos
Survey, design and drawings for roads and bridges that the reservoir will submerge.
Similar work
Survey of the existing left and right bank canals.
3 photos
18-acre topographic survey on a 5 m grid with as-built layouts at Kharadi, plus soil and groundwater sampling with NABL testing; site surveys at Thane and Chinchpokli.
Similar work
DGPS set-out of a new college building and compound wall; contour survey and set-out of a farm pond.
3 photos
18 corridor roads, 55 km: topographic, soil and traffic surveys, EHS studies, pavement design, DPRs and tender papers.
2 photos
Five packages, 41 roads and about 133 km, from field survey through administrative approval and technical sanction.
5 photos
PMC for 171.73 km of PMGSY and MMGSY roads built with full-depth reclamation: proof checking, layer-wise QC tests, FWD surveys and supervision.
4 photos
Two roads of 1.9 km widened to a 7 m two-lane carriageway: survey, design, estimates, contractor tenders and supervision.
Similar work
117 km of main canal, distributaries and water courses, 190 structures and a 200 ha block contour.
Similar work
7,058 ha DGPS command survey, chak planning and PDN design, 66 km double levelling, NX bores and component designs.
2 photos
252 m of NX core drilling logged for recovery and RQD, 11.75 ha contour survey, levelling and geological reports.
4 photos
Survey, GIS maps and the PARIVESH proposal through the State and National Boards for Wildlife.
3 photos
Surveys, plans, estimates and DPRs for state-scheme works, town planning approvals, and supervision to completion.
3 photos
Total station survey of development-plan roads and line marking on site.
Similar work
Pre- and post-work surveys for sewer lines, road top levels, plot and encroachment surveys, building line-out.
Photos taken by our survey, testing and investigation teams.
























Departments, municipal bodies, trusts and companies we have worked for.















Also five municipal councils (Sangamner, Rahuri, Mahabaleshwar, Akluj and Rajgurunagar), Zilla Parishads Pune, Palghar and Gondia, Chetak Engineers, Balason Infrastructure and D R Construction.

Send us the scope or the tender notice and we will reply with a methodology and fee.